In West University Place, decide the tree before the panels: design around it, trim it or remove it under the City's tree rules. That choice sets the array's size and how much power you export, and so how much your buyback plan matters. The worked example below prices one roof both ways.

Get your free quote

Private website concept.

Decide the tree before the panels

Walk the yard with the installer before anyone draws a layout. Name every tree that shades the roof, and for each one write down a choice: design around it, trim it, or remove it. Then ask which of those choices needs a City permit. The answer changes the system size, the price and which electricity plan is worth choosing.

The City says preserving its urban forest has been part of West University Place since 1992. The rules sit in the tree ordinance, Chapter 82 of the City code. The person who applies them is the Urban Forester, the City staff member who reviews tree plans and tree removal requests.

Trim

The City Manager told ABC13 in July 2025 that the ordinance "allows for pruning of 25% of the canopy without a permit." The canopy is the tree's leafy crown. The same report describes a family facing a $31,000 replacement bill after eight pecans were topped without a permit, and the contractor was cited.

So if a quote assumes heavy pruning to open the roof, ask the installer to state, in writing, what share of the canopy it would remove. Anything near or past 25% goes to the Urban Forester before that pruning goes into the production estimate.

Remove

The City's Tree Removal page asks for a removal application for any tree you plan to take out. As the page reads today, a permit is required for any tree 12 inches or more in diameter anywhere on the lot, or 10 inches or more in a front yard, a corner side-street yard or the right-of-way. On a lot with construction under way, the line is 10 inches everywhere. City staff inspect the tree before deciding, and the removal contractor must be registered with the City and insured.

A healthy tree that comes out has to be replaced. The City's Criteria Manual for the urban forest (revised 2019) scores each tree on ten factors, up to 40 points. The score sets the replacement inches, meaning the total trunk diameter you plant back:

Urban Forester score Replacement inches owed
Over 30 points 100% of the removed tree's diameter
20 to 30 points 75%
10 to 19 points 50%
Dead, dying or hazardous tree None

For every 10 inches owed, the manual calls for at least one 4-inch tree in a 100-gallon container, of a Class 1 or Class 2 species. Inches you can't plant on your own lot can be met through a Tree Trust planting or a deposit into the City's urban forest fund.

These numbers may move. In March 2026, Council voted 3–2 to revise the ordinance, Community Impact reported. Under the revision, a "large tree" would be defined from a 6-inch stump diameter and fines could reach $2,000. A permit would still be required, but the City could not deny an owner a permit to remove a tree on private property. A second reading was still pending when that report ran, and we could not confirm the outcome. Ask the Urban Forester for the current threshold before you count on any figure in this section.

Street trees

Trees in the right-of-way, the strip between sidewalk and street, stand on public land; the City's Tree Trust plants its trees there and in front setbacks. Removing one needs a permit from 10 inches. If a street tree shades your front roof, have the installer draw the array as if it stays, unless the Urban Forester tells you otherwise in writing.

One roof, two designs

Once you know what the City allows, ask for the same roof drawn twice: once around the canopy, once with the tree trimmed or removed. For each design, have the installer give the DC size, yearly kWh and the share exported to the grid. DC kW is the panels' rated output added together. The price per watt and the CenterPoint credit are both figured on it.

Illustrative example: one West U roof, two designs. A south-facing rear roof sits partly under a healthy backyard tree with a 24-inch trunk. Production uses 1,428 kWh per kW per year (EcoGen CSV v1-2026, Houston). Household use is 13,152 kWh a year (EcoGen CSV v1-2026 Texas average, 1,096 kWh a month). Shade losses and export shares are assumptions, not measurements.

Design A, work around the canopy: 8.4 kW on the open roof faces. With 12% yearly shade loss (assumption): 8.4 × 1,428 × 0.88 ≈ 10,556 kWh a year. A smaller array's output is used more at home, so assume 30% is exported: ≈ 3,167 kWh.

Design B, remove the tree: 9.2 kW with 3% shade loss (assumption) ≈ 12,743 kWh a year, still under the household's 13,152 kWh. Assume 40% is exported: ≈ 5,097 kWh.

What the tree costs in Design B: if the Urban Forester scores it over 30 points, you owe 100% of its 24-inch diameter, or 24 replacement inches. That is at least two 4-inch trees for the first 20 inches, plus whatever the City accepts for the last 4: another tree, a Tree Trust planting or a fund deposit. At 20 to 30 points it would be 18 inches; at 10 to 19 points, 12. Add the permit, the inspection and the shade the house loses.

Now value those exports at three hypothetical rates. None is taken from a real plan.

Hypothetical export value Design A (3,167 kWh) Design B (5,097 kWh)
12¢ per kWh $380 a year $612 a year
6¢ per kWh $190 a year $306 a year
3¢ per kWh $95 a year $153 a year
Gap between highest and lowest value $285 a year $459 a year

Read the last row first. With the tree kept, the export rate moves your yearly value by about $285. Take the tree out and that spread grows to about $459, roughly $174 more. Removing the tree raises the stakes on the plan as well as the panel count.

Keep the tree, and a modest buyback may cost you little, because in this example 70% of the solar power stays in the house. Remove it, and a weak buyback eats into extra output you paid for twice: once in panels, once in replacement trees.

Who buys your extra power, and why the tree changes the plan

The Houston installer pages that came up in a search for a West U installer don't explain who pays for your exports. One says your electric company will buy them. In West U that is only half right.

All of West U is in CenterPoint Energy's territory. CenterPoint is the wires utility: it delivers power to your home over its lines. It doesn't buy your solar exports. You buy electricity from a retail electric provider (REP), the company named on your plan. Texas has no statewide net metering, the system in some states where exports offset purchases one for one. Under Texas Utilities Code §39.916, you sell your surplus to the REP that serves your home "at a value agreed to" between you and that REP.

The terms sit on your plan's Electricity Facts Label (EFL), the standard fact sheet a REP publishes for each plan. EcoGen's Texas incentive research, checked in autumn 2026, describes three structures among the solar buyback plans it reviewed. Here is how each one fits the two designs:

Structure How exports are valued Fit with the West U example
Credit capped at energy charges or usage A bill credit per exported kWh, up to a limit Can suit Design A, where 30% of output leaves the house
Fixed export rate A set price per exported kWh Matters more as exports grow, as in Design B
Real-time wholesale rate The market price when you export The value moves; ask the REP how it has moved

The same law sets a sizing line. Under §39.916(k), you don't have to register with the Public Utility Commission if the system's estimated yearly output stays at or below your estimated yearly use. Both designs pass. Note how close Design B comes, though: removing the tree lifted output to about 97% of the household's use. On a bigger open roof, a design drawn to "sell the surplus" would cross that line and lean on a buyback rate that can change when your plan renews.

Proposed service. Affordable Solar TX's plan-match sheet would take the export kWh from each design and value them under all three structures, using rates printed on public EFLs on the day of the quote. It would also list each plan's credit cap, credit expiry, renewal date and early-termination fee. The sheet compares plan structures only. It would name no provider, take no commission from any REP, and leave the choice of plan to you. The homepage explains how the plan-match sheet works in more detail.

What the proposed West U quote would include

Coverage of West University Place is proposed and not yet confirmed. If it goes ahead, the proposed service would hand a West U homeowner these items in writing.

Proposed service: the written package.

  1. Two designs when a tree is in play. One around the canopy, one with the tree trimmed or removed. Each shows the layout, DC kW, yearly kWh, the solar-only cash price and the price per watt ($/W).
  2. Tree work as its own line. Pruning or removal, the permit, and an estimate of replacement inches, kept out of the solar price.
  3. The plan-match sheet. Exports per design, valued under the three buyback structures.
  4. The size-to-use note. Estimated yearly output next to your actual yearly use, so you can see each design stays at or below it.
  5. Who files what. The City electrical permit, any tree permit and the CenterPoint interconnection, each with a named filer.
  6. The CenterPoint credit line. Whether your home qualifies and whether the installer is a participating provider, stated plainly.

To prepare, the proposed service would ask you for 12 months of meter data downloaded from Smart Meter Texas, your current bill, and your plan's EFL with its contract end date. The meter data replaces an assumed export share, like the 30% or 40% above, with your own number. That matters most under heavy shade, where the gap between a guess and your actual use pattern is widest.

How a solar permit works in West University Place

West U runs its own permit office, separate from the City of Houston's. Ask any installer to walk you through these steps before you sign.

  1. A permit comes first. The City's Permits page requires a permit before anyone installs or alters a building or structure; electrical work is one of the listed permit types. The office is Community Development at 3826 Amherst Street.
  2. Filing is in person. The Applications, Forms and Registration page says applicants must apply in person for original signatures, licence checks and payment. The City doesn't accept faxed or emailed applications, and work can't start until the permit is issued.
  3. The contractor registers with the City. Registration requires at least $300,000 of general liability insurance naming the City as certificate holder, plus a copy of the state licence, and it lasts one year.
  4. Added load needs a load analysis. The City's Permitting and Plan Review Process page says that if new electrical work will change the load, a master electrician must submit a load analysis, and the City must approve it before the permit can be issued. A load analysis checks whether your service and panel can carry the total demand.
  5. Review time depends on the job. That page says some permits can be processed over the counter, while complex reviews take 10 to 15 business days. Urban Forester review of tree work is listed at 5 to 7 business days, so a design that depends on tree work has two clocks running.

Three questions the City's documents leave open for solar:

  • The 150-amp rule. The City's Electrical Permit Application (revised July 2026) sets a 150-amp minimum service, with an outside disconnect near the meter, when load is added or modified or the main panel is replaced. Homes under 1,500 square feet of framed area have a 125-amp exception. The form doesn't say whether a solar connection counts as a load change. Ask how the City will treat it before you budget, because a service upgrade is a separate cost.
  • The fee. The same form lists a $100 application fee (also the minimum), $75 per panel or sub-panel and $100 for a meter loop or service, but no line for solar. Ask how the City will calculate the permit fee for your system.
  • Wind design. The City's Structural Inspection Checklist lists a 136 mph design wind for wind bracing. Ask whether the racking is engineered to that figure and whether the City will want structural paperwork for roof-mounted panels.

Rebuilding? Three things change at once

Before you count a CenterPoint incentive, settle whether your project is an existing home or new construction. In West U, the answer also changes your tree rules.

CenterPoint's solar incentive pays $135 per kW of DC system size, capped at 15 kW. It goes to participating service providers, who show it as a credit on your installation invoice. Only existing single-family homes qualify. New home construction projects and homes that already have solar are not eligible, and you must sign an interconnection agreement with CenterPoint. Interconnection is the utility's approval to connect your system to its grid.

Same 8.4 kW design CenterPoint credit
Existing home, participating installer (Illustrative calculation: 8.4 × $135) $1,134
New-construction rebuild $0
Existing home, installer not participating $0

If you are building a new house on your lot, three things shift together:

  • The credit. Panels installed as part of the new-home project fall under CenterPoint's new-construction exclusion, so expect $0.
  • The tree threshold. The City's removal-permit line drops to 10 inches anywhere on a lot with construction under way, not just in the front yard.
  • The tree plan. The City's forestry page says the ordinance requires tree preservation plans with construction, so plan the array alongside the trees you are keeping.

So on a rebuild, a design that works around the canopy loses nothing to the tree rules, while one that depends on removal meets a lower permit threshold and still gets no CenterPoint credit. Never assume an installer participates in CenterPoint's program; get the answer on the quote.

Check the price per watt without the tree line

To check a solar price, divide the solar-only cash price by the system's DC watts and compare it with a benchmark built on the same terms. Keep tree work, a service upgrade and any battery out of the division. They are real costs, but they are not panel pricing.

The benchmark here is EcoGen's Texas solar cost page: $2.57 per watt (State benchmark, Solar Cost Index September 2026 Edition, prices as of September 25, 2026). That is a cash, homeowner-owned price before incentives, and EcoGen's typical Texas system of 9.29 kW comes to $23,875. EcoGen's methodology calls it a modeled installed price before incentives: a yardstick, not a quote.

Illustrative calculation: $/W check on a West U quote. An 8.4 kW design, solar-only cash price $22,700, with a separate $1,800 line for pruning the backyard tree. All figures except $2.57/W and $135/kW are hypothetical.

  • Solar-only: $22,700 ÷ 8,400 W = $2.70 per watt, about $0.13 (5%) above the State benchmark.
  • Tree line folded in: $24,500 ÷ 8,400 W = $2.92 per watt. That compares the wrong thing.
  • CenterPoint credit after the comparison: $1,134 on an existing home with a participating installer; $0 on a rebuild.

How to use the result: a few cents above the benchmark is a reason to ask what drives the price, such as panel choice or a layout split across two roof planes to dodge the canopy. A large gap needs a written explanation. If a quote won't split tree work or a service upgrade from the solar line, you can't run this check at all, so ask for the split.

Is solar still worth it here in 2026?

The federal residential clean energy credit (section 25D) is not available for systems placed in service after December 31, 2025. A homeowner who buys and owns a system in West U today gets no federal tax credit for it, whatever older sales pages still say about "large incentives".

The CenterPoint credit helps if your home is an existing one and the installer participates. Texas also has a property-tax exemption for solar energy devices under Tax Code §11.27; you apply on Form 50-123 with the appraisal district.

The rest of the value comes from two numbers you can test before signing: how much solar power you use at home, and what your plan pays for the rest. In West U the canopy drives both. A shaded design keeps more of its output in the house and leans less on the plan. An open design produces and exports more, but it may carry tree permits and replacement inches, and it depends more on a buyback rate that can change at renewal. Ask for both designs priced and valued, then decide whether the extra output justifies the tree work.

What your Texas solar contract must show

Texas changed the rules for residential solar sales in 2025. Under SB 1036, as summarized on TDLR's What's in Effect page, the contract must:

  • state that a licensed electrical contractor will do the installation, and conspicuously show that contractor's name and licence number;
  • say who obtains the permit and who obtains the utility's interconnection approval;
  • let you cancel in writing by the fifth business day.

Since September 1, 2026, solar retailers and salespeople must also be registered with the Texas Department of Licensing and Regulation (TDLR). Check the seller's registration before you sign.

In West U, add one line the law doesn't require: who files the tree permit, if the design depends on one. Without it, the step most likely to change your design has no owner, and a crew could prune past the 25% line on someone else's assumption.

West U quote checklist: questions before you sign

The quote checklist on this site carries these points for West University Place.

  1. Which trees shade the roof, and what work does each design assume?
  2. Who files the tree permit, and is the tree line separate? Confirm the current removal threshold and the 25% pruning line with the Urban Forester, and get an estimate of replacement inches.
  3. Is any shading tree in the right-of-way? If so, the design should assume it stays.
  4. What are the yearly kWh and the exported kWh for each design? Ask how the export share was estimated, and whether your Smart Meter Texas data was used.
  5. Which buyback structure fits that export share? Compare capped credit, fixed rate and wholesale against your current EFL, its renewal date and its early-termination fee.
  6. Does each design stay at or below your yearly use? Ask for the size-to-use figures side by side.
  7. Is the contractor registered with the City, with $300,000 of liability insurance naming the City?
  8. Who prepares the load analysis, and how will the City treat the 150-amp rule? Get the answer in writing before the price is final.
  9. Is this an existing home or a rebuild, and does the installer participate in CenterPoint's program? That decides whether the $135 per kW credit appears.
  10. What is the solar-only price per watt? Divide it yourself and compare it with the $2.57 State benchmark.
  11. Does the contract show the SB 1036 items, and is the seller registered with TDLR? Check the licence number and the cancellation window.